news 

February 10, 2020 - Ceiling T-Bar and wall covering has been installed in both Zones A and B (existing building). Installation of light fixtures and HVAC grills has begun in those areas. In Zone C, sheetrock is being hung with tape/mud following. Painting and wall covering in Zone D is taking place. Electrical rough in of the administrative area is happening. The roof over the Commons will be dried in this week with the break in the weather. Exterior metal siding installation continues. Storefront windows are being installed in Zones D and C. The site water main on the west side of the building (121st Ave) in being installed with additional fire hydrants. Exterior site benches and footings for bridges are being poured

January 17, 2020:
The basic structure has taken shape. New siding is being installed on the exterior. Interior work is moving forward. 

November 19, 2019:
Follow Pope Elementary construction progress on the webcam!
May 5, 2019: Construction work begins on Pope Elementary remodel and expansion